Skip to content

EPP5 - Power control reporting

STG#66 - Document STG(20)012 identify that EPP5 – “Collect Tx Power” doesn’t take into account power control when enabled for a generic system. It is noted that cellular systems are unaffected as in this case EPP5 reports only the Tx power after power control is applied. Proposed modification for EPP was developed for SEAMCAT version 5.3.1 and it considers interfering system and not victim system. STG#66 discussed the problem of not showing reporting power after power control. It was decided to address this issue at the following STG meetings when considering specifications of the existing EPPs in SEAMCAT.

It is noted that cellular systems are unaffected as in this case EPP5 reports only the Tx power after power control is applied. This may need to be considered further for consistency of reporting between all system types.

Task: In EPP5 show 3 vectors

  1. Tx power before PC (dBm)
  2. Tx power control gain (dB)
  3. Tx power after PC (dBm) (= Tx power before PC+ Tx power control gain)

Document attached elaborates problem and provides patch developed on the basis of v5.3.1 fixing interfering system STG_20_012_Power_control_reporting.docx

To upload designs, you'll need to enable LFS and have an admin enable hashed storage. More information